FLYOVER, PQC / DLC ROAD WORK & DRAIN CONSTRUCTION

Project Description

Start Date: 28th Dec 2016

 Stipulated Completion Date: 28th Jun 2018

 Actual Completion Date: On-Going

Construction of Flyover with approaches at “Halavad Cross Road” Ch. Km.237.000 on Bamanbore – Garamore Section of NH -8A (NH-27) Between KM.182.000 to Km. 254.000 in State of Gujarat.

Specification

Country & Location Within Country: Km. 182.000 to Km. 254.000, NH-27, Morbi District, Gujarat, India.

Name of Employer: National Highway Authority of India.

Status of The E5 Company in Project: Sub-Contractor.

Number of Staff Employed: Project Director, Project Manager, key engineers and management personnel (6), Skilled labour (10), Unskilled Labor (30), Drivers and Operators (15).

List of Equipment Employed: RMC Plant (1),  Wet Mix Plant (1), Batch Mix Plant  (1), Excavator (1), Soil Compactor (1), Tack Coat Tanker (1), Air Compressor (1), Tippers (4), Tractor trolley (1), Back Hoe Loader (1), Water Tanker (1), Paver with 7m attachment (1), Mechanical Boomer (1), Motor Grader (1), Welding Set(1), Concrete Pump (1), Vibrator  (4),  Staff Vehicles (4).

Details of Works Carried Out: Realignment of existing service road, Pavement Quality Concrete (PQC), Dry Lean Concrete (DLC) Excavation for drainage, shuttering & centring, M15, M25, M35 & M40 Grades of cement concrete for various works, Approaches to flyover, Construction of foundations, piers, Pillars, pier caps, Girder launching, Wet Mix Macadam, Granular sub Bade, Dense Bituminous Macadem, Bituminous Concrete, erection of crash barriers, signage, reflectors and lane marking.

GREENFIELD AIRPORT

Project Description

Start Date: 20th May 2016

 Stipulated Completion Date: 19th Nov 2017

 Actual Completion Date: 19th Nov 2017

Construction of New Runway, associated pavements and allied works at Rasoolanbad, Distt. Kanpur Dehat (U.P)

Specification

Country & Location Within Country: Rasoolabad, Kanpur Dehat, Uttar Pradesh, India.

Name of Employer: Airport Authorities of India / RITES

Status of The E5 Company in Project: Sub-Contractor.

Number of Staff Employed: Project Director, Project Manager, key engineers and management personnel (8), Skilled labour (28), Unskilled Labor (77).

List of Equipment Employed: Batch Mix Plant (1), Wet Mix Macadem Plant (1), Swing Stetter Cement Concrete (1), Plant Excavators (5), Backhoe Loader (4), Loader (1), Motor Grader (2), Floury (1), Tipper (30), Water Tanker (2), Tractor (2), Air Compressor (1), Flat bed Trailer (1), Soil Compactor (3), Paver with multiplex sonic sensor (2), Diesel generator (5), Welding set (3), Vibratory Roller (3), Bituminous sprayer tanker (1) .

Details of Works Carried Out: Designing through EPC mode, construction of runway, taxiway, apron, peripheral roads, drainage. Shrubbing and clearance of land, Earthwork in drain trenches, Embankment and slope construction, Granular sub-base, wet mix macadam, primer coat application, tack coat application, bituminous works including dense bituminous macadam & bituminous macadam & bituminous concrete, painting and markings with thermoplastic paint,  structural works including steel reinforcement by cutting, bending, tightening and binding/ construction of drainage & culverts with high-grade cement concrete and brickwork.

ROAD WIDENING AND OVERLAY

road-widening4

Project Description

Start Date: 28th Aug 2015

 Stipulated Completion Date: 20th Nov 2016

 Actual Completion Date: 23th April 2016

Project Name: Widening to 2 lanes with paved shoulders on NH-709 (extn.) from Km.123.520 to Km.146.500 in Bhiwani Distt. In the State of Haryana on EPC mode of execution.

Specifications

Country & Location Within Country: Km. 123.520 near Devsar Mor to km 146.500 before Jui village, NH-709 (extn.), Dist. Bhiwani, Haryana.

Name of Employer: National Highway Authorities of India.

Status of The E5 Company in Project: Sub-Contractor.

Number of Staff Employed: Project Director, Project Manager, key engineers and management personnel (6), Skilled labour (25), Unskilled Labor (67), Drivers and Operators (37).

List of Equipment Employed: List of Equipment Employed: Batch Mix Plant (1), Wet Mix Macadem Plant (1), Swing Stetter Cement Concrete (1), Vibrators (5), Excavators (2), Backhoe Loader (4), Loader (1), Motor Grader (1), Tipper (25), Water Tanker (2), Tractor (2), Air Compressor (1), Flat bed Trailer (1), Soil Compactor (2), Mini Roller (1), Paver with multiplex sonic sensor (2), Diesel generator (5), Welding set (3), Vibratory Roller (3), Bituminous sprayer tanker (1).

Details of Works Carried Out: Excavation for widening, drainage and culverts, 42 no. pipe culvers, 4 no. box culverts, M15,  M20, M35 M40 Grades Cement concrete works, Earthwork, Granular sub base, Wet mix macadam, Dense Bituminous Macadam, Emulation and tack coat, Bituminous Concrete overlay , slopes, camber and embankments, erecting of safety retro-reflective safety signage, thermoplastic Road marking.

ELIMINATION OF BLACK SPOTS VIA FLYOVER AND BRIDGE CONSTRUCTION

Project Description

Start Date: 18th Aug 2017

 Stipulated Completion Date: 9th Feb 2018

 Actual Completion Date: 20th Dec 2017

Providing long term improvement to 7 (seven) identified Black Spots at isolated locations on four lane Jetpur-Gondal-Rajkot Section between Km. 117.000 to Km. 185.000 on NH-8B (Now NH-27) in the State of Gujarat on EPC Mode.

Specification

Country & Location Within Country: Km. 117.00 to Km. 185.00, NH-27, Rajkot District, Gujarat, India.

Name of Employer: National Highway Authorities of India.

Status of The E5 Company in Project: Sub-Contractor.

Details of Works Carried Out: Excavation for drainage, shuttering & centring, M15, M25, M35 & M40 Grades of cement concrete for various works including PCC, raft and walls of drain,  Approaches to flyover, Construction of foundations, piers, Pillars, pier caps, Girder launching, Wet Mix Macadam, Granular sub Bade, Dense Bituminous Macadem, Bituminous Concrete, erection of crash barriers, signage, reflectors and lane marking.