Project Description
Start Date: 28th Dec 2016
Stipulated Completion Date: 28th Jun 2018
Actual Completion Date: On-Going
Construction of Flyover with approaches at “Halavad Cross Road” Ch. Km.237.000 on Bamanbore – Garamore Section of NH -8A (NH-27) Between KM.182.000 to Km. 254.000 in State of Gujarat.
Specification
Country & Location Within Country: Km. 182.000 to Km. 254.000, NH-27, Morbi District, Gujarat, India.
Name of Employer: National Highway Authority of India.
Status of The E5 Company in Project: Sub-Contractor.
Number of Staff Employed: Project Director, Project Manager, key engineers and management personnel (6), Skilled labour (10), Unskilled Labor (30), Drivers and Operators (15).
List of Equipment Employed: RMC Plant (1), Wet Mix Plant (1), Batch Mix Plant (1), Excavator (1), Soil Compactor (1), Tack Coat Tanker (1), Air Compressor (1), Tippers (4), Tractor trolley (1), Back Hoe Loader (1), Water Tanker (1), Paver with 7m attachment (1), Mechanical Boomer (1), Motor Grader (1), Welding Set(1), Concrete Pump (1), Vibrator (4), Staff Vehicles (4).
Details of Works Carried Out: Realignment of existing service road, Pavement Quality Concrete (PQC), Dry Lean Concrete (DLC) Excavation for drainage, shuttering & centring, M15, M25, M35 & M40 Grades of cement concrete for various works, Approaches to flyover, Construction of foundations, piers, Pillars, pier caps, Girder launching, Wet Mix Macadam, Granular sub Bade, Dense Bituminous Macadem, Bituminous Concrete, erection of crash barriers, signage, reflectors and lane marking.